# Prioritization matrix: five ways to rank a list, with an example of each

Source: https://decka.dev/ideas/prioritization-matrix

A prioritization matrix for every decision: impact vs effort, the Eisenhower matrix, weighted scoring, RICE and MoSCoW, each with a worked example.

## Which prioritization matrix to use

A prioritization matrix sorts a list by two or more things you care about, so the order comes from the criteria rather than from whoever argues hardest. Pick the kind by what you're sorting.

You're choosing | 
Use | 
It sorts by | 
A team's ideas or projects | 
Impact vs effort | 
How much it helps, and what it costs | 
Your own tasks this week | 
Eisenhower matrix | 
Urgent, and important | 
Between three or four big options | 
Weighted scoring | 
Your own criteria, weighted | 
A product backlog with usage data | 
RICE | 
Reach, impact, confidence and effort | 
What fits before a fixed deadline | 
MoSCoW | 
Must, should, could, won't | 

The first two are true two-by-two grids. Weighted scoring is a table, RICE is a formula and MoSCoW is four labels. All five answer the same question: what goes first.

## Impact vs effort: the prioritization matrix for a team's ideas

Draw a square. Impact goes up the side and effort along the bottom. Place each idea where the team thinks it belongs, then read the four corners:

- **High impact, low effort:** quick wins. Do these first.
- **High impact, high effort:** big bets. Plan them properly.
- **Low impact, low effort:** fill-ins. Do them if there's time.
- **Low impact, high effort:** money pits. Let them go.

**An example.** A team asking "How do we make onboarding faster?" might put a one-page quick-start guide in quick wins and a rebuilt signup flow in big bets. A weekly live Q&A call could be a fill-in. Custom onboarding videos for every client look like a money pit.

The full guide to the [impact effort matrix](/activities/impact-effort-matrix), with the whole room placing every idea from their phones, is on its own page.

## Effort is the axis teams get wrong

Impact is a matter of opinion, and a room argues about it openly. Effort feels like a fact, so nobody argues with it. That's a mistake, and a well-measured one.

Roger Buehler, Dale Griffin and Michael Ross open their 1994 paper with Montreal's Olympic stadium. Its retractable roof was in place in 1989, [13 years late](https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf), and cost [$120 million on its own](https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf), the figure once promised for the whole Olympics.

Then they asked [37 psychology students](https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf) at the University of Waterloo when they'd hand in their honours thesis. The average estimate was [33.9 days](https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf). The average student took [55.5](https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf). Fewer than a third finished in the time they'd predicted.

Two later findings in the same paper tell you what to do about it:

- **Ask for the last time.** When people were told to connect [relevant past experiences](https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf) to their prediction, the optimistic bias disappeared. Before the team places effort, ask "When did we last do something like this, and how long did it really take?"
- **Ask someone who won't do the work.** Observers predicting someone else's task erred the other way, overestimating the time, and leaned on past experience more. One outsider's dot on the effort axis is a useful counterweight.

If a big bet keeps drifting left into quick wins, the drift is the warning. The idea hasn't got easier. The room has got more hopeful.

## The Eisenhower matrix: urgent vs important

The Eisenhower matrix sorts tasks by two questions. Is it urgent? Is it important? The usual labels for the four boxes:

- **Urgent and important:** do it now.
- **Important, not urgent:** schedule it.
- **Urgent, not important:** hand it to someone else.
- **Neither:** drop it.

**An example.** A client's broken invoice due today is do-it-now. Next quarter's hiring plan is schedule-it. Most of the inbox is hand-it-on, and the report nobody reads is drop-it.

The name comes from a speech. In 1954, at the World Council of Churches assembly in Evanston, Illinois, Dwight Eisenhower quoted a former college president: "I have two kinds of problems, [the urgent and the important](https://www.presidency.ucsb.edu/documents/address-the-second-assembly-the-world-council-churches-evanston-illinois). The urgent are not important, and the important are never urgent."

He was borrowing the line, and the four-box grid that carries his name isn't in the speech. His point is the useful part: important work never feels urgent, so it loses every day to whatever does. Fill the schedule-it box first, and put it in the calendar.

Use this matrix for one person's week. A team's list of ideas is mostly important and rarely urgent, so every idea lands in the same box and the grid tells you nothing. For a team, impact vs effort does the sorting.

## Weighted scoring: a decision matrix for a few big options

When the choice is between three or four large options, a weighted scoring matrix makes the trade-offs visible.

- List the options down the side.
- List the criteria across the top, and give each a weight from 1 to 3.
- Score each option against each criterion from 1 to 5, where 5 is always best. On cost, the cheapest option scores highest.
- Multiply each score by its weight, and add up each row.

**An example.** A team choosing how to get a new help centre:

Option | 
Cost (weight 3) | 
Speed (weight 2) | 
Control (weight 1) | 
Total | 
Build it ourselves | 
2 × 3 = 6 | 
1 × 2 = 2 | 
5 × 1 = 5 | 
13 | 
Buy a ready tool | 
4 × 3 = 12 | 
5 × 2 = 10 | 
2 × 1 = 2 | 
24 | 
Hire an agency | 
1 × 3 = 3 | 
4 × 2 = 8 | 
3 × 1 = 3 | 
14 | 

Agree the weights before anyone scores an option. Weights set afterwards can be chosen to make a favourite win. And if the winner surprises the room, argue about the weights, not the arithmetic.

## RICE scoring for a product backlog

RICE comes from a 2018 post by Sean McBride on Intercom's blog. It scores each idea on [four factors](https://www.intercom.com/blog/rice-simple-prioritization-for-product-managers/): reach, impact, confidence and effort.

- **Reach:** how many people it affects in a set period, such as customers a quarter.
- **Impact:** how much it helps each one: 3 for massive, 2 for high, 1 for medium, and [less than 1](https://www.intercom.com/blog/rice-simple-prioritization-for-product-managers/) for low and minimal.
- **Confidence:** high counts in full, medium at [80%](https://www.intercom.com/blog/rice-simple-prioritization-for-product-managers/) and low at [half](https://www.intercom.com/blog/rice-simple-prioritization-for-product-managers/).
- **Effort:** person-months.

Multiply reach, impact and confidence, then divide by effort, because more effort is a bad thing.

**An example.** Faster search reaches 600 customers a quarter, at medium impact (1), with high confidence and 2 person-months of effort: 600 × 1 ÷ 2 = 300. A new report reaches 200 customers at massive impact (3), with high confidence and 1 person-month: 200 × 3 ÷ 1 = 600. If nobody has data on the report, its confidence is low, and its score halves to 300, level with faster search.

The confidence factor is the clever part. McBride added it to [curb enthusiasm](https://www.intercom.com/blog/rice-simple-prioritization-for-product-managers/) for exciting but ill-defined ideas. An idea with a huge impact score and no data behind it gets marked down until someone finds the data.

## MoSCoW prioritization for a fixed deadline

MoSCoW sorts the work for a fixed date into four groups, as the DSDM project framework defines them:

- **Must have:** without it, there's no point delivering on the date. The test is to ask what happens if it's missing. If the answer is "cancel the project", it's a must.
- **Should have:** important but not vital. Painful to leave out, but there's a workaround.
- **Could have:** wanted, but less important. The first to drop when the deadline is at risk.
- **Won't have this time:** agreed out of scope, and written down so it isn't quietly brought back.

The rule that's easiest to miss is the budget. DSDM recommends keeping must-haves to [no more than 60%](https://www.agilebusiness.org/resource/what-is-moscow-prioritization/) of the effort, with could-haves at [about 20%](https://www.agilebusiness.org/resource/what-is-moscow-prioritization/), so there's room to drop something when the plan slips.

So add up the effort of your musts. If they fill nearly all the time you have, they aren't all musts, or the date is wrong.

## A prioritization matrix template you can draw in a minute

For impact vs effort, this is the whole template:

 | 
Low effort | 
High effort | 
**High impact** | 
Quick wins: do first | 
Big bets: plan it | 
**Low impact** | 
Fill-ins: if there is time | 
Money pits: let it go | 

- **Write the question above it.** "What should we build next quarter?" sorts differently from "What would make our week better?"
- **Keep the list to about a dozen.** Past that, the corners crowd and the talk turns into a queue.
- **Number the ideas.** Dots with numbers are easier to talk about than dots with half a sentence on them.

## Fill in a prioritization matrix as a group

The usual way is one person at a whiteboard while the room calls out where each idea goes. Whoever speaks first sets the first placement, and the room adjusts around it. The quiet person who knows the work is hard may never say so.

Have everyone place every idea alone first, then compare. A tight cluster means the room agrees. A wide spread is the most useful thing on the board, because one person knows something the others don't.

[Impact Grid](/activities/impact-effort-matrix) runs it this way. Every phone drags each idea onto its own pad, and the big screen keeps the dots grey until you press Reveal the grid. Then it takes the room through each idea's cloud, saying where the room agrees and where it's split.

The big screen at the shortlist. Assign every new customer a buddy is named under Start here, and below it the four quadrants list their ideas with their dots.

After the reveal, everyone spends dots on what to do first, and the big screen names one idea under Start here. There's more on running that step well in this guide to [dot voting](/ideas/dot-voting).

## Frequently asked questions

### What is a prioritization matrix?

A grid or table that ranks a list of tasks, ideas or projects by criteria you choose, such as impact and effort, or urgent and important. It makes the reasons for the order visible.

### What is the difference between an impact effort matrix and an Eisenhower matrix?

An impact effort matrix sorts ideas by how much they help and what they cost, and suits a team choosing projects. An Eisenhower matrix sorts tasks by urgent and important, and suits one person's week.

### What are the four quadrants of the Eisenhower matrix?

Urgent and important (do it now), important but not urgent (schedule it), urgent but not important (hand it on) and neither (drop it).

### What does MoSCoW stand for?

Must have, Should have, Could have and Won't have this time. Only the capital letters stand for something. The two o's are there to make a word you can say.

### What are the most common prioritization techniques?

Impact vs effort, the Eisenhower matrix, weighted scoring, RICE and MoSCoW are the five on this page. Dot voting can be used alongside any of them to narrow a long list first.

### How many items should go on a prioritization matrix?

About a dozen for a two-by-two filled in by a group. A weighted scoring matrix works best with three or four options.

## Activities